NewDetail

AICEP
Agência para o Investimento e Comércio Externo de Portugal

CABEÇALHO

EDP Renováveis plans to build a photovoltaic solar power plant in Cesaredas, in the municipality of Peniche and Leiria district.

According to the non-technical study of the project, available on the public consultation online platform Participa (https://participa.pt/pt/consulta/central-solar-fotovoltaica-de-cesaredas ), at stake is the construction of around 30,000 photovoltaic modules, with a power of 17.9 megawatts (MW).

 

EDP Renováveis intends to “hybridize with the existing power plant (Serra D'el Rei Wind Farm) and inherently produce electricity from a renewable, endogenous and non-polluting source – solar energy, thus contributing to Portuguese targets that refer to the production of energy from renewable sources, contained in the National Energy Strategy”.

 

In The Portugal News

Partilhar